Free Webinar

"The Future of Industrial Training: the New Digital Classroom"



About the Webinar:
At TPC Training Systems, we’ve been on the hunt for ways that our industrial skills training solutions can evolve to meet the needs of all of our customers, and we’ve learned some things in the process. In this webinar, we’ll share what we’ve learned and give you a preview of the future of industrial training.

You’ll learn about:
  • The best uses of webcast and simulcast training formats
  • The advantages of blended online and live training
  • Virtual reality (VR) training environments, including an exclusive sneak peek inside a VR simulation

  • Menu
    Implementing Preventive Maintenance

    Implementing Preventive Maintenance

    This online maintenance management course covers what preventive maintenance (PM) is and why it is necessary. Develops procedures for setting up a practical PM program, and describes effects of PM on scheduled and unscheduled work. Explains the requirements and advantages of the program as it applies to maintenance management. Provides information on the relationship of PM to production and quality control. Implementing Preventive Maintenance is available in online and course manual formats.

    TPC Training Systems is authorized by IACET to offer 0.5 CEUs for this program.

    Review a full course list for Maintenance Supervisor

    Select Format

    • Online Course & Test $85.00
    • Course Manual $57.00

    Please select a format.

    Lesson 1: The Need for PM

    Topics:

    The scope of PM; Good programs pay off; Costs  cut dramatically; Inspections; Establishing maintenance routes; Steps in planning; Review; Decide; Implement; Maintenance job orders; Priorities; Scheduling

    Objectives:
    – List the six functions of a typical PM Program.
    – List the major benefits of PM.
    – Explain the three stages involved in the planning process.
    – Describe the function of the maintenance job order.
    – Explain the use of a priority system.


    Lesson 2: Setting Up a PM Program

    Topics:

    Strategies for gaining support; Setting up the program; Organizing for action; Checklists; Securing cooperation; Setting up a lube program; Lubricating follow-through

    Objectives:
    – Describe the elements needed to establish a preventive maintenance program.
    – List the data that can be obtained from review of inspection reports.
    – Distinguish between preventive and predictive maintenance.
    – Explain the preparation of inspection checklists.
    – Explain how to set up a lubrication program.


    Lesson 3: Scheduling PM

    Topics:

    Scheduling—what it is and isn’t; Long-range planning; Forecasting; Forecasting tips; Short-range scheduling; Scheduling meetings; Conducting the scheduling meeting; Measuring schedule compliance; Using work orders in scheduling

    Objectives:
    – Describe the importance of scheduling to the maintenance program.
    – Describe the role that the production department plays in maintenance scheduling.
    – Explain the uses of forecasting and long-range planning.
    – List the types of jobs that should appear on a weekly schedule.
    – Explain how and why weekly scheduling meetings should be held.
    – Measure compliance with scheduling.


    Lesson 4: Controlling Work

    Topics:

    Control of emergency work; Control of unscheduled work; Repetitive preventive maintenance services; Using the standing work order; Forecasting scheduled work; Forecasting planned scheduled work; Using the schedule effectively; Work order flow; Handling work assignments; Reporting labor and material use; The engineering work order; Span of control; Communications and control; Controlling specific types of work; Maintenance management network

    Objectives:
    – List the criteria for assigning emergency status to a situation.
    – Describe the use of the master schedule and standing work order.
    – Describe the techniques for controlling emergency, scheduled, unscheduled, and preventive maintenance work.
    – Explain the role forecasting plays in planning and scheduling.
    – Report labor and material use.


    Lesson 5: Quality Control

    Topics:

    Before the job starts; Organizing materials; Tool control; Transportation and rigging; Contact with planning; Sizing up labor requirements; Control during the job; Actions at the worksite; After the work is completed; Follow-up report

    Objectives:
    – List short cuts for obtaining spare parts and other materials that are often used in routine repairs.
    – Estimate crew labor necessary for efficient job execution.
    – Describe the supervisor’s role at the work-site in terms of labor control, accident prevention, and quality control.
    – Explain the role of quality control.
    – Describe the steps involved in evaluating a completed job.

    © Copyright 2017 TPC Training SYSTEMS. All rights reserved